The clock is ticking. Climate change doesn't wait for humans to catch up.

Traditional large-scale housing construction takes two to three years to complete, we do it in nine months.

What our partners say:

Slide

Finch Buildings is the connecting link between client, architect, contractor, and factory. Their experience with large-scale modular timber construction gave us the confidence that the project is not only innovative, but also feasible and reliable.

Marieke Heilbron - Managing Director, Elan Wonen

previous arrow
next arrow

Solid timber

Solid timber

Our buildings are solid timber. The only renewable, healthy, high-quality building material. Sustainably sourced and managed.

CO2-free

CO2-free

Our buildings store CO2. They save CO2 emissions in construction with virtually no emissions during manufacturing.

Sustainable

Sustainable

All-electric, energy-efficient buildings designed for circularity and generational resilience.

Fast

Fast

We build up to three times faster than traditional construction methods.

Independent

Independent

It's not just about what we do. It's as much about how we do it. Complete transparancy and independence allows us to provide the smartest, most cost-effective solutions to our clients.

Solid timberfreccia icon

We make our buildings from solid wood. The only renewable, healthy, high-quality building material.

CO2-freefreccia icon

Buildings as CO2 buffer. Finch Buildings store CO2. There are virtually no emissions from production.

Gaslessfreccia icon

Our buildings are gasless. We manufacture all-electric and energy-efficient buildings as standard.

Circularfreccia icon

Finch designs and builds circularly. Our buildings are generation-resistant in both design and materials.

Fastfreccia icon

We build up to three times faster than using traditional methods and materials.