You are a CLIENT

You are a

CLIENT

 A Finch Buildings project follows a clear process. In it, we work as a "systems shed" to provide all the
guide parties in the project in the application of our wood building system.

 A Finch Buildings project follows a clear process. In it, we work as a "systems shed" to guide all parties to the project in the application of our wood building system.

Phase 1: Inventory
Objective:
 a single starting point determine for your construction task.

We believe that a partnership only makes sense when we can efficiently solve your construction needs.

That process begins with a good inventory in which we explore the (im)possibilities, discuss opportunities and risks.

In this phase, we gather all relevant information needed to develop a
Quick Scan to be made.

Phase 2: Quick Scan
Objective:
 Analysis of your task from our modular construction method.

Output quick scan:
  • A 3D volume study LOD 100 (level of detail)
     o Made up of four colors. These denote traditionally built building components (such as the foundation), all "100% Finch" modules and any deviations from the Finch Platform.
  • Key figure estimate per m2 GLA
     o For the construction and design-related additional costs of your listing.
  • High-level technical description of Finch's supplies and services.

Phase 2: Quick Scan
Objective:
 Analysis of your task from our modular construction method.

Output quick scan:

  • A 3D volume study LOD 100 (level of detail)

     o Made up of four colors. These denote traditionally built building components (such as the foundation), all "100% Finch" modules and any deviations from the Finch Platform.

  • Key figure estimate per m2 GLA

     o For the construction and design-related ancillary costs of your listing.

  • High-level technical description of Finch's supplies and services.

Phase 3: Structure design
Objective:
 Detail outcome quick scan and a clear, task-setting construction budget.

Output structure design:

  • A LOD 200 volume study and inventory of any deviations from the Finch Platform outline.

  • A ceiling budget setup for construction costs.

  • An estimate of design-related incremental costs.

  • A technical description and overall demarcation for Finch's supplies and services linked to the ceiling budget.

Phase 4: Design process

The volume study and associated task-setting construction budget is the basis for the continued design process.

Finch Buildings remains involved throughout the design process:
  • as a consultant
  • responsible for the technical development of the modules
  • monitoring the (technical) preconditions for our building system
  • we advise on the demarcation between factory work and construction site work
  • we provide the architect and client with solicited and unsolicited advice to optimize the project

  • If desired, we can act as architects